ABOUT

Solutions & Cases

Our Case
  • PILBARA IRON ORE PROJECT REHABILITATION AND

    2016-07-22· PILBARA IRON ORE Fortescue Metal Group Ltd Rehabilitation and Revegetation Management Plan . Page 4 . 1. INTRODUCTION 1.1 BACKGROUND . Fortescue Metals Group Limited (FMG) is proposing to develop the Pilbara Iron Ore and Infrastructure Project (the Project), which involves a series of iron ore mines in the Pilbara

  • PILBARA IRON ORE PROJECT Borrow Pit Rehabilitation Procedure

    2016-08-11· PILBARA IRON ORE Fortescue Metal Group Ltd DRAFT Borrow Bit Rehabilitation Procedure DRAFT Borrow Pit Rehabilitation Procedure 1. PURPOSE A number borrow pits will be constructed throughout the life of a project. The rehabilitation of these areas is necessary to achieve FMG’s closure objectives.

  • Evolution in revegetation of iron-ore mines in Minas Gerais

    The results of this study are in line with revegetation results of iron ore mines in Minas Gerais state, Brazil, where both native and introduced species performed well (Griffith and Toy, 2001).

  • REHABILITATION OF DEGRADED SITES Unasylva 207

    2007-01-09· Damage to native vegetation by iron-ore mines has been a major public concern in Brazil. In response to this criticism, managers increasingly use native species in their revegetation projects. For the past decade, a major shortcoming of revegetation programmes has been a lack of long-term rehabilitation

  • Western Range DSO Iron Ore Project Volume 7: Mine Closure Plan

    2016-01-11· Western Range DSO Iron Ore Project This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject to the terms of that appointment. It is addressed to and for the sole and confidential use and reliance of

  • Appendix J Rehabilitation & Mine Closure Plan

    2016-07-01· final rehabilitation. 1.1 Project overview The Sherwin Creek Iron Ore Project area within MLA29584 (Figure 1) is located approximately 540 km south-south-east of Darwin and is within EL24101. It is accessed via the Stuart Highway south to Mataranka and then approximately 150kms east along the Roper Highway towards Roper Bar and the Gulf of

  • Rehabilitation 360 Environmental

    Revegetation can be used as a proactive measure, to improve water ways, wetland buffers and aesthetics. 360 Environmental’s has proven project management experience in all aspects of rehabilitation activities including revegetation

  • Infrastructure Rehabilitation 360 Environmental

    360 Environmental can provide expert advice and regulatory compliance for all aspects of rehabilitation and restoration for your infrastructure project, from vegetation assessments, rehabilitation feasibility studies and on-ground implementation to monitoring, the reporting of compliance criteria and close out.

  • Getting revegetation off the ground Australian Mining

    2020-07-07· BHP Iron ore’s head of environment Gavin Price added that “a core principal of the RSB is that it is a collaborative, engaging, and locally practiced with global implications”.

  • Rehabilitation plans and other environmental aspects of

    2020-07-07· Revegetation is usually the primary objective of rehabilitation and is often the measure of its success. Revegetation with native species may involve direct seeding, planting tube stock, natural regeneration or any

  • Evolution in revegetation of iron-ore mines in Minas

    The results of this study are in line with revegetation results of iron ore mines in Minas Gerais state, Brazil, where both native and introduced species performed well (Griffith and Toy, 2001).

  • Liberia NIOC Iron Ore Rehabilitation Project (English)

    Liberia NIOC Iron Ore Rehabilitation Project (English) Abstract. The project's objectives are to rehabilitate NIOC's iron ore mining operations and reestablish its financial viability. Beneficiated ore output would be increased from 2.3 to 3.25 million long tons

  • Rehabilitation plans and other environmental aspects of

    2020-07-07· Revegetation is usually the primary objective of rehabilitation and is often the measure of its success. Revegetation with native species may involve direct seeding, planting tube stock, natural regeneration or any

  • Draft EIS Appendix P Rehabilitation and Closure Plan

    2016-07-01· final rehabilitation. 1.1 Project Overview The proposed layout of the mining lease areas of the project are presented in Figure 1. This initial Rehabilitation and Closure Plan (RCP) is submitted as an appendix to the project EIS, and the information summarised in this project overview is analysed in detail elsewhere.

  • Revegetation process increases the diversity of total and

    Revegetation accelerates iron ore mining waste recovery with fungi and AMF diversity. • Combination of morphological and molecular techniques potentializes study of AMF. • Undisturbed area serves as fungi inoculum repository for adjacent areas. • Study of AMF in the revegetation process may be useful for recovering degraded area. •

  • A review on dump slope stabilization by revegetation with

    2017-08-28· Revegetation process is one of the important methods which can make the ecologically challenging task of Fig. 1 Slope failure in a subgrade dump of iron ore mines Fig. 2 Slope failure in a fine dump of iron ore mines Ranjan et al. Ecological Processes (2015) 4:14 Page 2 of 11

  • Guinea GHEMS Revegetation Hydromulching Native

    The Mount Nimba Iron Ore Project required the preparation and implementation of an Environmental Management System (EMS) for the protection and revegetation of surfaces exposed during exploration, limiting sedimentation in water catchment areas and protecting biological values of the down slope areas.

  • A review on dump slope stabilization by revegetation with

    The waste, subgrade ROM and fine dumps of iron ore mines are characterized by high rock fragment contents, low moisture retention capacity, higher bulk density, low nutrients, lower pH and elevated metal concentrations. Use of suitable revegetation programme, that require the selection of right type of plants to be used vis-à-vis the site condition and characteristics, can enhance the long

  • Massive power station revegetation project completed in

    Flinders Power has been managing the rehabilitation of the Port Augusta site since its closure and reached an agreement in February to sell the coastal land to CU-River Mining. The South Australian iron ore magnetite producer plans to develop a $250 million port facility on the 1068ha site.

  • Iron Ore And Taconite Mine Reclamation And Revegetation

    2016-05-18· Iron Ore And Taconite Mine Reclamation And Revegetation wildlife habitat or other land uses such as pasture or timberland (Dewar 1989). The Iron Range Resources and Rehabilitation Board (IRRRB) N ratios of 69:1 to 196:1. All sites in the research project were low in organic material, nitrogen, phosphorus, and water